Here is a video of what we have done so far. You can see that I took the video before I finished the decking around the garage...
Monday, November 12, 2007
Sunday, November 04, 2007
Oct. 2007 House wrap and driveway
I have finished with the inside plumbing and electrical and had my 4 way inspection. Also We put in a large drain at the base of the driveway and had the driveway installed as well as new curb and gutter and sidewallk. There are no pictures of the inside of the building yet. We have also preped the outside of the garage for th stone which has been ordered. Also decking has been ordered and should be here soon. things are going well and we are trying to get things on the exterior finished before the weather gets bad. Were in a hurry...
Saturday, April 28, 2007
Retaining Wall Foundation (April 2007)
Aaron O'Conner, my neighbor, helped me set the forms. We spent one day getting the forms from a rental company. I was planning on using the simons forms (metal) but found out that my step footings were poured incorrectly for this type of form. So we rented the old forms that we used on the garage foundation. We had to cut a lot of plywood to make it work but everything seemed to turn out great. Originally I was going to hire this whole job out but like most contractors the bailed on me. It took 11/2 days to set the forms and get them ready to pour. We poured Yesterday (Friday) Today we removed the forms.
Demolition for New retaining wall (April)
Again I have rented an excavator for busting up and removing the concrete steps at the West side of the house. Once this is done I will beginning excavation for the water line to the garage and also for the footings to the new retaining wall. In one day I took 9 loads of busted up concrete to the recycling place.