Sunday, November 04, 2007

Oct. 2007 House wrap and driveway



I have finished with the inside plumbing and electrical and had my 4 way inspection. Also We put in a large drain at the base of the driveway and had the driveway installed as well as new curb and gutter and sidewallk. There are no pictures of the inside of the building yet. We have also preped the outside of the garage for th stone which has been ordered. Also decking has been ordered and should be here soon. things are going well and we are trying to get things on the exterior finished before the weather gets bad. Were in a hurry...

0 Comments:

Post a Comment

<< Home